Office building turned student accommodation in Leicester.
Advanced Glass delivered a complex façade package as part of the refurbishment of an office building into student accommodation at Last Plantagenet on Granby Street, Leicester. Working for MJE Construction, the four-month project involved the installation of Rockpanel cladding, bespoke pressed metal cladding, Technal windows, and integrated fire stopping.
The scheme required careful coordination due to a tight city-centre site, bespoke backing structures, and complicated fire stop interfaces through multiple cladding systems. Strong acoustic performance and fire compliance were key requirements, alongside achieving a thermal performance of 1.4 W/m²K. Detailed design work and upfront planning were essential to resolving interface challenges and ensuring compliance with Approved Documents B and L.
The façade installation was completed successfully in time for the student intake in September. Feedback from both the main contractor and the end client was extremely positive, with particular praise for Advanced Glass’s ability to deliver a complex design that others were unable to accommodate.
Planning a similar project? Get in touch with Advanced Glass today to discuss your bespoke glazing needs.






