Butlins – Bognor Regis, New Entertainment Building
High performance Glazing for Popular Holiday Resort
Project Details
TL;DR:
Butlins Activity Centre – Bognor Regis
Advanced Glass delivered curtain walling, main entrance doors, and full door automation for the new activity centre at Butlins in Bognor Regis, working for AMIRI Construction. The project was completed within a tight 16-week programme and required careful design coordination due to the building’s proximity to the coastline and its acoustic performance requirements.
The façade package utilised Technal curtain walling, Prosale doors, and glazing supplied by Ravensby, with acoustic glass incorporated on multiple elevations to meet varying performance demands.
One of the key technical challenges was supporting the curtain wall mullions from the steelwork only 25 percent up the member, requiring bespoke detailing to achieve stability and compliance. Despite the complex interfaces and demanding acoustic specification, the project was completed successfully, meeting all performance expectations.
Feedback from Butlins was positive, and the installation has contributed to a high-quality new activity centre for the resort.
Advanced Glass was appointed by AMIRI Construction to deliver the façade package for the new activity centre at Butlins, Bognor Regis. The 16-week programme required a fast, coordinated approach to ensure all elements of the building’s entrance and envelope were installed safely and efficiently.
Scope of Works
Our package included:
Technal curtain walling
Prosale main entrance doors
Door automation
Glazing supplied by Ravensby
The activity centre is located within 500 metres of the coastline, requiring consideration of exposure conditions and robust material performance. Acoustic glass was installed on several elevations to meet Butlins’ specific requirements for sound control within the facility.
Technical & Design Considerations
A key challenge on this project was the need to support the curtain wall mullions from the steelwork at only 25 percent of the mullion height. This required careful structural and connection detailing to ensure stability and compliance while maintaining clean sightlines.
Additional design information, such as interface details, performance specifications, or regulatory requirements, was managed according to the information provided by the project team.
Installation & Programme Delivery
The façade installation was completed within the project’s 16-week duration.
Where details such as access conditions, coordination with trades, or site constraints were applicable, they were managed in line with AMIRI Construction’s programme and site strategy.
Performance Requirements
Acoustic performance: Acoustic glass was installed on varying elevations to meet differing performance criteria.
Thermal, fire, and security requirements: The project team followed all relevant specifications provided; no additional requirements were noted in the information supplied.
Project Outcome
The installation was completed successfully and met all required performance standards. Butlins expressed positive feedback regarding the completed façade package. Approved photographs are available for use, subject to formal permission.
What next?
From luxury restaurants to hotels, city centre offices, heritage buildings, and rural schools, Advanced Glass delivers tailored curtain walling and glazing solutions to meet the demanding performance and aesthetic needs of our clients and their customers.
To discuss this project or to discover how we can help you, please contact one of our experienced team members today by calling 01455 241844, or [click here] to send us a message.
High performance Glazing for Popular Holiday Resort
This website uses cookies to improve your experience. If you continue to use this site, you agree with it.